Frequently Asked Questions
-
Yes, in some cases. A heat pump does not necessarily require removing your gas furnace immediately. A hybrid system uses both a heat pump and gas heating, with controls determining when each operates. For buildings with a furnace and central air conditioning, a heat pump can replace the existing AC and either replace or supplement the furnace. The project team should establish a strategy that maximizes heat-pump operation and clearly defines the temperature at which a hybrid system switches to gas.
If the longer-term goal is to eliminate fossil-fuel use, the project team can evaluate backup heating that is consistent with that goal rather than automatically retaining gas backup.
Check out stop 3: Understand your options
-
Not necessarily. Some buildings may be able to use existing electrical capacity, particularly when a heat pump is replacing an existing air conditioner. The project team should confirm that the proposed system is compatible with the building's available electrical capacity. If capacity is constrained, options such as a hybrid system may reduce the amount of additional electrical capacity required. Some buildings, however, will require an electrical service or panel upgrade.
This is something to investigate during planning rather than after equipment has been selected.Check out stop 1: Know your building
Check out stop 5: Design
-
There may be some disruption during installation, but it can be planned for. Consider occupant disruption when setting the project schedule—for example, coordinating installation with vacancies or other renovations where possible—and require the project team to develop a plan to minimize disruption during construction.
Once operating, the intended effect should generally be positive from an occupant perspective. Heat Pumps provide more consistent indoor temperatures and adding cooling to a building that previously did not have air conditioning can improve comfort, particularly during extreme heat.
Check out stop 6: Construction
-
There is no single installation timeline. The overall project process can take months or, for more involved projects, longer, once planning, team selection, design, construction and commissioning are included. For that reason, owners are encouraged to begin planning well before existing equipment fails.
Start to plan if equipment may need replacement within the next five years, rather than waiting for an emergency replacement. Where possible, installation can also be scheduled for spring or fall to reduce the risk of heating or cooling disruption during extreme weather.
Check out stop 2: Know your timeline
-
It depends on the building and the system. A heat pump uses electricity very efficiently, but the effect on the total utility bill depends on factors including equipment efficiency, system design, controls, electricity and gas prices, and how much gas use is displaced.
The business case should be evaluated for the particular building, including both operating and capital costs.
Check out stop 3: Understand your options
-
Yes, depending on the building and project goals. There are a variety of pathways to explore so owners should not assume every building must fully electrify in one project. A heat pump can replace or augment existing heating equipment, and a furnace + AC project can involve either fully or partially replacing the furnace. Hybrid systems can also provide an interim approach where electrical capacity, equipment timing or other constraints make immediate full electrification difficult.
Coordinating heat-pump work with normal capital projects—for example, roof work, renovations or equipment reaching end-of-life is often beneficial. This can allow improvements to happen at logical intervention points rather than requiring everything to be completed simultaneously.
Check out stop 2: Know your timeline
Check out stop 3: Understand your options
-
An emergency replacement can limit your options, but it does not necessarily rule out a heat pump. If heating or cooling equipment fails unexpectedly, the immediate priority will usually be restoring service. Ask your contractor whether a heat pump is a viable replacement before automatically replacing the failed equipment with a like-for-like system.
If a full heat-pump solution cannot be implemented immediately, options such as a hybrid system or phased approach may allow heat-pump technology to be incorporated while addressing immediate building needs.
The best way to avoid being forced into an emergency decision is to start planning before equipment reaches end-of-life. Begin to consider replacement options when major equipment may need replacement within the next five years.
Check out stop 2: Know your timeline
Check out stop 3: Understand your options